0 Views 2026-09-17 09:04 PPOEM

6 mm PETG Battery Boxes Vacuum Forming for Truck And Bus

Vacuum formed battery boxes are used across truck and bus because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 6 mm PETG sheet is formed for truck and bus, what tolerances are realistic, and what has to be on the drawing before tooling starts.

The route below is the one used for most of the battery boxes shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For battery boxes the sheet gauge is selected from the load case rather than from habit, and PETG is the material most often specified for this combination.

battery boxes vacuum formed for truck and bus

Typical specification

ItemValue
Part typebattery boxes
Industrytruck and bus
MaterialPETG
Sheet thickness6 mm (1.5–12 mm available)
Maximum forming area3,000 × 2,000 mm
Typical tolerance±0.5 mm formed, ±0.2 mm on trimmed edges
Toolingaluminium for production, composite for samples
First article7–15 working days
Production lead time3–4 weeks after approval
Finishas formed, textured, painted or printed

Where these parts are used

  • bunk liners for truck and bus
  • stepwell panels for truck and bus
  • interior trim panels for truck and bus
  • engine tunnel covers for truck and bus
  • battery boxes in general truck and bus builds

How the part is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. The part cools on a jig so the shape is held while the material stabilises.
  6. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  7. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

Material notes: PETG

PETG forms at a low temperature, holds detail well and is accepted for food contact, which suits trays, guards and machine covers in food plants.

PETG sheet formed into battery boxes

Design tips for this part

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • plan the trim line on a flat face so the router can hold tolerance
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Quality and inspection

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

Cost and lead time

Tooling is the main cost driver at low volume, so a 6 mm battery boxes for truck and bus is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is faster design changes compared with the alternatives, and a piece price that stays stable across repeat releases.

  • Sample tooling: 7–15 working days
  • Production tooling: 3–4 weeks
  • Repeat orders run on stored tooling with no new proving run

Frequently asked questions

What quantities make sense?

Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.

What do you need to quote?

A 3D file or drawing, the material if it is fixed, the annual quantity and the finish. Photos of the current part are enough for a first estimate.

How long does tooling take?

Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.

Getting started

Send the drawing or a photo of the current battery boxes with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

vacuum forming production of battery boxes

Need a part like this?

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.

Get a Quote

Leave a Message