• Sales@ppoem.com
  • Beijing-time 08:00 am - 5:30 pm

1500 Battery Boxes HDPE Thermoformed for Dental Equipment in 6 Weeks

Vacuum forming case study: battery boxes for dental equipment produced in 8 mm HDPE, 1500 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: ABS Splash Guards for Defence And Security Equipment – 5000 Parts at 4 mm

Vacuum forming case study: splash guards for defence and security equipment produced in 4 mm ABS, 5000 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

600 Cable Covers PVC Thermoformed for Motorcycle And Scooter in 8 Weeks

Vacuum forming case study: cable covers for motorcycle and scooter produced in 4 mm PVC, 600 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Motorcycle And Scooter Case: 2 mm ESD safe ABS Light Housings from Drawing to Production

Vacuum forming case study: light housings for motorcycle and scooter produced in 2 mm ESD safe ABS, 900 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Water Treatment Builder Replaced a machined aluminium housing with Vacuum Formed Tank Covers in HIPS

Vacuum forming case study: tank covers for water treatment produced in 10 mm HIPS, 400 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: polypropylene Centre Consoles for Retail Display – 2400 Parts at 6 mm

Vacuum forming case study: centre consoles for retail display produced in 6 mm polypropylene, 2400 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Rail Transit Interiors Case: 8 mm polypropylene Control Panels from Drawing to Production

Vacuum forming case study: control panels for rail transit interiors produced in 8 mm polypropylene, 1500 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Solar And Wind Energy Builder Replaced an injection moulded part with Vacuum Formed Ventilation Shrouds in PC/ASA

Vacuum forming case study: ventilation shrouds for solar and wind energy produced in 3 mm PC/ASA, 2400 pieces, tooling to first article in 8 weeks, full dimensional reporting.

1 Views PPOEM 17 Sep,2026

900 Carry Cases ESD safe ABS Thermoformed for Solar And Wind Energy in 6 Weeks

Vacuum forming case study: carry cases for solar and wind energy produced in 1.5 mm ESD safe ABS, 900 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: flame retardant ABS Centre Consoles for Garden And Outdoor Power Equipment – 5000 Parts at 8 mm

Vacuum forming case study: centre consoles for garden and outdoor power equipment produced in 8 mm flame retardant ABS, 5000 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Marine And Boat Building Builder Replaced a welded steel fabrication with Vacuum Formed Plastic Enclosures in ESD safe ABS

Vacuum forming case study: plastic enclosures for marine and boat building produced in 1.5 mm ESD safe ABS, 8000 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Retail Display Case: 10 mm PMMA acrylic Carry Cases from Drawing to Production

Vacuum forming case study: carry cases for retail display produced in 10 mm PMMA acrylic, 2400 pieces, tooling to first article in 5 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026