• Sales@ppoem.com
  • Beijing-time 08:00 am - 5:30 pm

Calculate colour consistency: A Practical Thermoforming Guide – Food Contact Parts

This guide covers how to calculate colour consistency on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before

0 Views PPOEM 17 Sep,2026

How to Validate colour consistency in Vacuum Forming – 6 mm Sheet

This guide covers how to validate colour consistency on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before t

0 Views PPOEM 17 Sep,2026

How to avoid sheet grade on Thick Gauge Parts – 6 mm Sheet

This guide covers how to avoid sheet grade on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Reduce sheet heating the Right Way – Short Runs

This guide covers how to reduce sheet heating on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

Understanding mould temperature control – Outdoor Parts

In vacuum forming and thermoforming, mould temperature control is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry ex

0 Views PPOEM 17 Sep,2026

5 axis routing vs Die cutting: Which Route Fits Your Part – Short Runs

5 axis routing and die cutting are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The compa

0 Views PPOEM 17 Sep,2026

Design cool down time the Right Way – Thick Gauge Work

This guide covers how to design cool down time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

Improve rib layout: A Practical Thermoforming Guide – Short Runs

This guide covers how to improve rib layout on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Calculate first article approval the Right Way – Medical Housings

This guide covers how to calculate first article approval on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems bef

0 Views PPOEM 17 Sep,2026

Batch to batch consistency in Thermoforming: Practical Notes – Food Contact Parts

In vacuum forming and thermoforming, batch to batch consistency is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry e

0 Views PPOEM 17 Sep,2026

Plan cool down time: A Practical Thermoforming Guide – Medical Housings

This guide covers how to plan cool down time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

Maintain scrap rate the Right Way – High Volume Runs

This guide covers how to maintain scrap rate on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026