How to Calculate batch repeatability in Vacuum Forming – High Volume Runs

This guide covers how to calculate batch repeatability on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before

1 Views PPOEM 17 Sep,2026

Flame retardant abs or Standard abs – A Comparison for Thermoforming

flame retardant ABS and standard ABS are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The

0 Views PPOEM 17 Sep,2026

Avoid cool down time – Method and Checks – Medical Housings

This guide covers how to avoid cool down time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

How to maintain tooling cost on Thick Gauge Parts – Food Contact Parts

This guide covers how to maintain tooling cost on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

How to quote lead time Before Tooling Starts – Food Contact Parts

This guide covers how to quote lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cu

1 Views PPOEM 17 Sep,2026

How to measure insert placement on Thick Gauge Parts – High Volume Runs

This guide covers how to measure insert placement on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tool

1 Views PPOEM 17 Sep,2026

Quote texture depth: A Practical Thermoforming Guide – Short Runs

This guide covers how to quote texture depth on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

1 Views PPOEM 17 Sep,2026

Dimensional report: Definition and How It Works

In vacuum forming and thermoforming, dimensional report is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explains

1 Views PPOEM 17 Sep,2026

Measure surface finish the Right Way – High Volume Runs

This guide covers how to measure surface finish on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before toolin

0 Views PPOEM 17 Sep,2026

How to Maintain lead time in Vacuum Forming – Large Housings

This guide covers how to maintain lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

How to compare sheet grade on Thick Gauge Parts – Large Housings

This guide covers how to compare sheet grade on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

How to reduce draw ratio on Thick Gauge Parts – High Volume Runs

This guide covers how to reduce draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026