Vacuum formed tank liners are used across vending and kiosk because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 12 mm PETG sheet is formed for vending and kiosk, what tolerances are realistic, and what has to be on the drawing before tooling starts.
The route below is the one used for most of the tank liners shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For tank liners the sheet gauge is selected from the load case rather than from habit, and PETG is the material most often specified for this combination.

| Item | Value |
|---|---|
| Part type | tank liners |
| Industry | vending and kiosk |
| Material | PETG |
| Sheet thickness | 12 mm (1.5–12 mm available) |
| Maximum forming area | 3,000 × 2,000 mm |
| Typical tolerance | ±0.5 mm formed, ±0.2 mm on trimmed edges |
| Tooling | aluminium for production, composite for samples |
| First article | 7–15 working days |
| Production lead time | 3–4 weeks after approval |
| Finish | as formed, textured, painted or printed |
PETG forms at a low temperature, holds detail well and is accepted for food contact, which suits trays, guards and machine covers in food plants.

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Tooling is the main cost driver at low volume, so a 12 mm tank liners for vending and kiosk is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is faster design changes compared with the alternatives, and a piece price that stays stable across repeat releases.
Material certificates, dimensional reports and flame retardancy or food contact declarations are issued with the shipment where the specification requires them.
Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.
Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.
Send the drawing or a photo of the current tank liners with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.
Leave a Message