Vacuum formed ventilation shrouds are used across water treatment because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 10 mm PVC sheet is formed for water treatment, what tolerances are realistic, and what has to be on the drawing before tooling starts.
The route below is the one used for most of the ventilation shrouds shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For ventilation shrouds the sheet gauge is selected from the load case rather than from habit, and PVC is the material most often specified for this combination.

| Item | Value |
|---|---|
| Part type | ventilation shrouds |
| Industry | water treatment |
| Material | PVC |
| Sheet thickness | 10 mm (1.5–12 mm available) |
| Maximum forming area | 3,000 × 2,000 mm |
| Typical tolerance | ±0.5 mm formed, ±0.2 mm on trimmed edges |
| Tooling | aluminium for production, composite for samples |
| First article | 7–15 working days |
| Production lead time | 3–4 weeks after approval |
| Finish | as formed, textured, painted or printed |
PVC sheet brings flame retardancy and chemical resistance at a low price, common in equipment covers and clean room panels.

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Tooling is the main cost driver at low volume, so a 10 mm ventilation shrouds for water treatment is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is lower tooling cost compared with the alternatives, and a piece price that stays stable across repeat releases.
A 3D file or drawing, the material if it is fixed, the annual quantity and the finish. Photos of the current part are enough for a first estimate.
Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.
Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.
Send the drawing or a photo of the current ventilation shrouds with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.
Leave a Message