Vacuum formed splash guards are used across defence and security equipment because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 10 mm ABS sheet is formed for defence and security equipment, what tolerances are realistic, and what has to be on the drawing before tooling starts.

The route below is the one used for most of the splash guards shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For splash guards the sheet gauge is selected from the load case rather than from habit, and ABS is the material most often specified for this combination.

splash guards vacuum formed for defence and security equipment

Typical specification

ItemValue
Part typesplash guards
Industrydefence and security equipment
MaterialABS
Sheet thickness10 mm (1.5–12 mm available)
Maximum forming area3,000 × 2,000 mm
Typical tolerance±0.5 mm formed, ±0.2 mm on trimmed edges
Toolingaluminium for production, composite for samples
First article7–15 working days
Production lead time3–4 weeks after approval
Finishas formed, textured, painted or printed

Where these parts are used

  • case shells for defence and security equipment
  • antenna covers for defence and security equipment
  • console covers for defence and security equipment
  • transport trays for defence and security equipment
  • splash guards in general defence and security equipment builds

How the part is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. The part cools on a jig so the shape is held while the material stabilises.
  6. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  7. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

Material notes: ABS

ABS is the default choice where the part needs stiffness, a paint finish and clean trimmed edges. It forms evenly, takes texture well and bonds with standard solvents.

ABS sheet formed into splash guards

Design tips for this part

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • plan the trim line on a flat face so the router can hold tolerance
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Quality and inspection

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

Cost and lead time

Tooling is the main cost driver at low volume, so a 10 mm splash guards for defence and security equipment is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is lower piece price compared with the alternatives, and a piece price that stays stable across repeat releases.

  • Sample tooling: 7–15 working days
  • Production tooling: 3–4 weeks
  • Repeat orders run on stored tooling with no new proving run

Frequently asked questions

What quantities make sense?

Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.

How long does tooling take?

Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.

Do you supply certificates?

Material certificates, dimensional reports and flame retardancy or food contact declarations are issued with the shipment where the specification requires them.

Getting started

Send the drawing or a photo of the current splash guards with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

vacuum forming production of splash guards

Need a part like this?

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.