Vacuum formed machine housings are used across defence and security equipment because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 3 mm food grade polypropylene sheet is formed for defence and security equipment, what tolerances are realistic, and what has to be on the drawing before tooling starts.
The route below is the one used for most of the machine housings shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For machine housings the sheet gauge is selected from the load case rather than from habit, and food grade polypropylene is the material most often specified for this combination.

| Item | Value |
|---|---|
| Part type | machine housings |
| Industry | defence and security equipment |
| Material | food grade polypropylene |
| Sheet thickness | 3 mm (1.5–12 mm available) |
| Maximum forming area | 3,000 × 2,000 mm |
| Typical tolerance | ±0.5 mm formed, ±0.2 mm on trimmed edges |
| Tooling | aluminium for production, composite for samples |
| First article | 7–15 working days |
| Production lead time | 3–4 weeks after approval |
| Finish | as formed, textured, painted or printed |
Food grade polypropylene is used for trays, hoppers and liners that touch product, and it can be washed with caustic cleaners.

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Tooling is the main cost driver at low volume, so a 3 mm machine housings for defence and security equipment is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is lower piece price compared with the alternatives, and a piece price that stays stable across repeat releases.
Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.
A 3D file or drawing, the material if it is fixed, the annual quantity and the finish. Photos of the current part are enough for a first estimate.
Material certificates, dimensional reports and flame retardancy or food contact declarations are issued with the shipment where the specification requires them.
Send the drawing or a photo of the current machine housings with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.
Leave a Message