Vacuum formed machine housings are used across office furniture because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 10 mm UV stabilised HDPE sheet is formed for office furniture, what tolerances are realistic, and what has to be on the drawing before tooling starts.
The route below is the one used for most of the machine housings shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For machine housings the sheet gauge is selected from the load case rather than from habit, and UV stabilised HDPE is the material most often specified for this combination.

| Item | Value |
|---|---|
| Part type | machine housings |
| Industry | office furniture |
| Material | UV stabilised HDPE |
| Sheet thickness | 10 mm (1.5–12 mm available) |
| Maximum forming area | 3,000 × 2,000 mm |
| Typical tolerance | ±0.5 mm formed, ±0.2 mm on trimmed edges |
| Tooling | aluminium for production, composite for samples |
| First article | 7–15 working days |
| Production lead time | 3–4 weeks after approval |
| Finish | as formed, textured, painted or printed |
UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Tooling is the main cost driver at low volume, so a 10 mm machine housings for office furniture is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is faster design changes compared with the alternatives, and a piece price that stays stable across repeat releases.
Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.
Material certificates, dimensional reports and flame retardancy or food contact declarations are issued with the shipment where the specification requires them.
Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.
Send the drawing or a photo of the current machine housings with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.