• Sales@ppoem.com
  • Beijing-time 08:00 am - 5:30 pm
0 Views 2026-09-17 09:07 PPOEM

Thick Gauge Vacuum Forming of Carry Cases in Hvac Equipment from 10 mm polypropylene

Vacuum formed carry cases are used across HVAC equipment because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 10 mm polypropylene sheet is formed for HVAC equipment, what tolerances are realistic, and what has to be on the drawing before tooling starts.

The route below is the one used for most of the carry cases shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For carry cases the sheet gauge is selected from the load case rather than from habit, and polypropylene is the material most often specified for this combination.

carry cases vacuum formed for HVAC equipment

Typical specification

ItemValue
Part typecarry cases
IndustryHVAC equipment
Materialpolypropylene
Sheet thickness10 mm (1.5–12 mm available)
Maximum forming area3,000 × 2,000 mm
Typical tolerance±0.5 mm formed, ±0.2 mm on trimmed edges
Toolingaluminium for production, composite for samples
First article7–15 working days
Production lead time3–4 weeks after approval
Finishas formed, textured, painted or printed

Where these parts are used

  • unit covers for HVAC equipment
  • condensate trays for HVAC equipment
  • fan shrouds for HVAC equipment
  • duct end caps for HVAC equipment
  • carry cases in general HVAC equipment builds

How the part is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. The part cools on a jig so the shape is held while the material stabilises.
  6. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  7. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

Material notes: polypropylene

Polypropylene survives repeated impact and most cleaning chemicals. Its low forming temperature keeps cycles short, but it shrinks more, so the mould is cut with the shrink factor built in.

polypropylene sheet formed into carry cases

Design tips for this part

  • plan the trim line on a flat face so the router can hold tolerance
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Quality and inspection

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

Cost and lead time

Tooling is the main cost driver at low volume, so a 10 mm carry cases for HVAC equipment is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is lighter weight compared with the alternatives, and a piece price that stays stable across repeat releases.

  • Sample tooling: 7–15 working days
  • Production tooling: 3–4 weeks
  • Repeat orders run on stored tooling with no new proving run

Frequently asked questions

What quantities make sense?

Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.

How long does tooling take?

Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.

Do you supply certificates?

Material certificates, dimensional reports and flame retardancy or food contact declarations are issued with the shipment where the specification requires them.

Getting started

Send the drawing or a photo of the current carry cases with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

vacuum forming production of carry cases

Need a part like this?

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.

Get a Quote

Leave a Message