Vacuum formed cable covers are used across HVAC equipment because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 12 mm HDPE sheet is formed for HVAC equipment, what tolerances are realistic, and what has to be on the drawing before tooling starts.
The route below is the one used for most of the cable covers shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For cable covers the sheet gauge is selected from the load case rather than from habit, and HDPE is the material most often specified for this combination.

| Item | Value |
|---|---|
| Part type | cable covers |
| Industry | HVAC equipment |
| Material | HDPE |
| Sheet thickness | 12 mm (1.5–12 mm available) |
| Maximum forming area | 3,000 × 2,000 mm |
| Typical tolerance | ±0.5 mm formed, ±0.2 mm on trimmed edges |
| Tooling | aluminium for production, composite for samples |
| First article | 7–15 working days |
| Production lead time | 3–4 weeks after approval |
| Finish | as formed, textured, painted or printed |
HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.
Tooling is the main cost driver at low volume, so a 12 mm cable covers for HVAC equipment is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is faster design changes compared with the alternatives, and a piece price that stays stable across repeat releases.
Yes. Send a sample or scan and the part can be reverse engineered, with the wall thickness and material measured from the sample.
Material certificates, dimensional reports and flame retardancy or food contact declarations are issued with the shipment where the specification requires them.
Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.