• Sales@ppoem.com
  • Beijing-time 08:00 am - 5:30 pm
0 Views 2026-09-17 09:07 PPOEM

ASA Equipment Covers for Beauty And Spa Equipment – 1.5 mm Sheet, Tooling and Lead Time

Vacuum formed equipment covers are used across beauty and spa equipment because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 1.5 mm ASA sheet is formed for beauty and spa equipment, what tolerances are realistic, and what has to be on the drawing before tooling starts.

The route below is the one used for most of the equipment covers shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For equipment covers the sheet gauge is selected from the load case rather than from habit, and ASA is the material most often specified for this combination.

equipment covers vacuum formed for beauty and spa equipment

Typical specification

ItemValue
Part typeequipment covers
Industrybeauty and spa equipment
MaterialASA
Sheet thickness1.5 mm (1.5–12 mm available)
Maximum forming area3,000 × 2,000 mm
Typical tolerance±0.5 mm formed, ±0.2 mm on trimmed edges
Toolingaluminium for production, composite for samples
First article7–15 working days
Production lead time3–4 weeks after approval
Finishas formed, textured, painted or printed

Where these parts are used

  • device housings for beauty and spa equipment
  • lamp covers for beauty and spa equipment
  • treatment bed shells for beauty and spa equipment
  • trolley trays for beauty and spa equipment
  • equipment covers in general beauty and spa equipment builds

How the part is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. The part cools on a jig so the shape is held while the material stabilises.
  6. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  7. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

Material notes: ASA

ASA keeps its colour and surface under UV better than ABS, which suits outdoor covers that are not painted.

ASA sheet formed into equipment covers

Design tips for this part

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Quality and inspection

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

Cost and lead time

Tooling is the main cost driver at low volume, so a 1.5 mm equipment covers for beauty and spa equipment is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is lower piece price compared with the alternatives, and a piece price that stays stable across repeat releases.

  • Sample tooling: 7–15 working days
  • Production tooling: 3–4 weeks
  • Repeat orders run on stored tooling with no new proving run

Frequently asked questions

Can you match an existing part?

Yes. Send a sample or scan and the part can be reverse engineered, with the wall thickness and material measured from the sample.

What do you need to quote?

A 3D file or drawing, the material if it is fixed, the annual quantity and the finish. Photos of the current part are enough for a first estimate.

How long does tooling take?

Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.

Getting started

Send the drawing or a photo of the current equipment covers with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

vacuum forming production of equipment covers

Need a part like this?

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.

Get a Quote

Leave a Message