Vacuum formed centre consoles are used across playground equipment because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 1.5 mm TPO sheet is formed for playground equipment, what tolerances are realistic, and what has to be on the drawing before tooling starts.
The route below is the one used for most of the centre consoles shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For centre consoles the sheet gauge is selected from the load case rather than from habit, and TPO is the material most often specified for this combination.

| Item | Value |
|---|---|
| Part type | centre consoles |
| Industry | playground equipment |
| Material | TPO |
| Sheet thickness | 1.5 mm (1.5–12 mm available) |
| Maximum forming area | 3,000 × 2,000 mm |
| Typical tolerance | ±0.5 mm formed, ±0.2 mm on trimmed edges |
| Tooling | aluminium for production, composite for samples |
| First article | 7–15 working days |
| Production lead time | 3–4 weeks after approval |
| Finish | as formed, textured, painted or printed |
TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Tooling is the main cost driver at low volume, so a 1.5 mm centre consoles for playground equipment is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is lighter weight compared with the alternatives, and a piece price that stays stable across repeat releases.
Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.
A 3D file or drawing, the material if it is fixed, the annual quantity and the finish. Photos of the current part are enough for a first estimate.
Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.
Send the drawing or a photo of the current centre consoles with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.
Leave a Message