0 Views 2026-09-17 10:31 PPOEM

Custom Tank Liners Thermoforming in LDPE for Defence And Security Equipment at 4 mm

Vacuum formed tank liners are used across defence and security equipment because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 4 mm LDPE sheet is formed for defence and security equipment, what tolerances are realistic, and what has to be on the drawing before tooling starts.

The route below is the one used for most of the tank liners shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For tank liners the sheet gauge is selected from the load case rather than from habit, and LDPE is the material most often specified for this combination.

tank liners vacuum formed for defence and security equipment

Typical specification

ItemValue
Part typetank liners
Industrydefence and security equipment
MaterialLDPE
Sheet thickness4 mm (1.5–12 mm available)
Maximum forming area3,000 × 2,000 mm
Typical tolerance±0.5 mm formed, ±0.2 mm on trimmed edges
Toolingaluminium for production, composite for samples
First article7–15 working days
Production lead time3–4 weeks after approval
Finishas formed, textured, painted or printed

Where these parts are used

  • antenna covers for defence and security equipment
  • transport trays for defence and security equipment
  • case shells for defence and security equipment
  • console covers for defence and security equipment
  • tank liners in general defence and security equipment builds

How the part is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. The part cools on a jig so the shape is held while the material stabilises.
  6. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  7. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

Material notes: LDPE

LDPE is flexible and tough in thin section, used for liners and protective covers that have to bend during fitting.

LDPE sheet formed into tank liners

Design tips for this part

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • plan the trim line on a flat face so the router can hold tolerance

Quality and inspection

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

Cost and lead time

Tooling is the main cost driver at low volume, so a 4 mm tank liners for defence and security equipment is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is lower piece price compared with the alternatives, and a piece price that stays stable across repeat releases.

  • Sample tooling: 7–15 working days
  • Production tooling: 3–4 weeks
  • Repeat orders run on stored tooling with no new proving run

Frequently asked questions

Can you match an existing part?

Yes. Send a sample or scan and the part can be reverse engineered, with the wall thickness and material measured from the sample.

What quantities make sense?

Vacuum forming pays off from roughly 25 pieces up to several thousand a year. Below that, printed or composite tooling keeps the setup cost low.

Do you supply certificates?

Material certificates, dimensional reports and flame retardancy or food contact declarations are issued with the shipment where the specification requires them.

Getting started

Send the drawing or a photo of the current tank liners with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

vacuum forming production of tank liners

Need a part like this?

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.

Get a Quote

Leave a Message