Vacuum formed storage bins are used across truck and bus because they can be produced without the tooling spend of injection moulding and without the weight of sheet metal. This page covers how 12 mm ABS/PMMA sheet is formed for truck and bus, what tolerances are realistic, and what has to be on the drawing before tooling starts.
The route below is the one used for most of the storage bins shipped from this plant: sheet is heated on the forming machine, drawn over an aluminium or composite mould, cooled on a jig, then trimmed on a 5-axis router. For storage bins the sheet gauge is selected from the load case rather than from habit, and ABS/PMMA is the material most often specified for this combination.

| Item | Value |
|---|---|
| Part type | storage bins |
| Industry | truck and bus |
| Material | ABS/PMMA |
| Sheet thickness | 12 mm (1.5–12 mm available) |
| Maximum forming area | 3,000 × 2,000 mm |
| Typical tolerance | ±0.5 mm formed, ±0.2 mm on trimmed edges |
| Tooling | aluminium for production, composite for samples |
| First article | 7–15 working days |
| Production lead time | 3–4 weeks after approval |
| Finish | as formed, textured, painted or printed |
ABS/PMMA combines an ABS core with a hard acrylic cap, so the part has the toughness of ABS and the UV and scratch resistance of acrylic.

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Tooling is the main cost driver at low volume, so a 12 mm storage bins for truck and bus is usually quoted with a composite or printed mould first and the aluminium tool cut once the design is frozen. That keeps the first article cost low and gives a real part to test before the production tool exists. The result is repeatable quality compared with the alternatives, and a piece price that stays stable across repeat releases.
Yes. Send a sample or scan and the part can be reverse engineered, with the wall thickness and material measured from the sample.
Sample and first article tooling is usually cut in 7 to 15 working days. Production aluminium tools take 3 to 4 weeks depending on size and cooling layout.
Material certificates, dimensional reports and flame retardancy or food contact declarations are issued with the shipment where the specification requires them.
Send the drawing or a photo of the current storage bins with the quantity and the finish. The first reply is a manufacturability review with the wall thickness, material and a quotation, so the decision is made on facts rather than on a price alone.

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.
Leave a Message