Refrigeration Case: 12 mm food grade polypropylene Skid Plates from Drawing to Production

When a refrigeration maker asked for a quotation on skid plates, the parts were still being built as a welded steel fabrication. At 600 pieces a year the tooling and the unit cost were both too high. The programme moved to a vacuum formed skid plates in 12 mm food grade polypropylene, and the numbers changed with it.

skid plates vacuum forming case for refrigeration

The starting point

  • Part: skid plates for refrigeration
  • Existing route: a welded steel fabrication
  • Annual volume: 600 pieces
  • Problems: high unit cost, long lead time, and variation between batches

What was wrong with the old route

The previous welded steel fabrication needed several operations to reach finished shape, and every operation added both cost and a chance for variation. Weight was higher than it needed to be, and design changes meant new fixtures each time. For a programme of 600 pieces a year that is a poor fit.

What we built

ItemValue
Processthick gauge vacuum forming, 5-axis CNC trimming
Materialfood grade polypropylene at 12 mm
Forming area usedup to 3,000 × 2,000 mm
Toolingaluminium production mould with a composite sample tool first
Finishas formed gloss
Batch size75 pieces per release
First article5 weeks from drawing release
Documentationdimensional report, material certificate, first article inspection

skid plates formed from food grade polypropylene

Process route

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  6. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

Results

  • cut tooling cost by 60 percent
  • First article approved in 5 weeks
  • Tooling amortised inside the first production batch
  • Repeat releases match the approved sample: tooling and programmes are stored against the part number
  • 600 pieces shipped to date with no dimensional escapes

Lessons from this project

  • The 12 mm was set from the load case, which avoided over specifying the sheet and paying for weight that was not needed
  • Draft and radii were checked before the tool was cut, so the first sample released without hand work
  • The trim line was placed on a flat face, which kept the router inside ±0.2 mm
  • Tooling and programmes are stored against the part number, so repeat releases need no new proving run

What the client said

“The sample arrived on the date we were given and it fitted the assembly on the first try. The skid plates is lighter than the part it replaced and the finish holds up in the field. We now release the skid plates against stored tooling and the paperwork comes with the shipment.”

Frequently asked questions

Could the same route work on a different part?

If the part is a shell, cover, tray or enclosure between 1.5 mm and 12 mm thick, it is almost always worth quoting. Send the drawing and the answer comes back with a material and a tooling plan.

How is the tooling handled between orders?

Tooling, trim fixtures and programmes are kept against the part number for the life of the programme, so a repeat release needs no new proving run.

finished skid plates ready for shipment

Next step

Send the drawing or the existing skid plates with the annual quantity. The reply is a manufacturability review, a material recommendation and a quotation within 24 hours.

Need a part like this?

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.

Get a Quote

Leave a Message