This marine and boat building project started with one question: could control panels be vacuum formed instead of produced as a welded steel fabrication? The answer was yes at 12 mm polycarbonate, and the part went from drawing to approved sample in 8 weeks. Here is the route and the result.

The previous welded steel fabrication needed several operations to reach finished shape, and every operation added both cost and a chance for variation. Weight was higher than it needed to be, and design changes meant new fixtures each time. For a programme of 600 pieces a year that is a poor fit.
| Item | Value |
|---|---|
| Process | thick gauge vacuum forming, 5-axis CNC trimming |
| Material | polycarbonate at 12 mm |
| Forming area used | up to 3,000 × 2,000 mm |
| Tooling | aluminium production mould with a composite sample tool first |
| Finish | as formed gloss |
| Batch size | 75 pieces per release |
| First article | 8 weeks from drawing release |
| Documentation | dimensional report, material certificate, first article inspection |

“The sample arrived on the date we were given and it fitted the assembly on the first try. The control panels is lighter than the part it replaced and the finish holds up in the field. We now release the control panels against stored tooling and the paperwork comes with the shipment.”
If the part is a shell, cover, tray or enclosure between 1.5 mm and 12 mm thick, it is almost always worth quoting. Send the drawing and the answer comes back with a material and a tooling plan.
Tooling, trim fixtures and programmes are kept against the part number for the life of the programme, so a repeat release needs no new proving run.

Send the drawing or the existing control panels with the annual quantity. The reply is a manufacturability review, a material recommendation and a quotation within 24 hours.
Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.
Leave a Message