Retail Display Case: 2 mm polypropylene Tank Liners from Drawing to Production

When a retail display maker asked for a quotation on tank liners, the parts were still being built as a fibreglass lay-up. At 600 pieces a year the tooling and the unit cost were both too high. The programme moved to a vacuum formed tank liners in 2 mm polypropylene, and the numbers changed with it.

tank liners vacuum forming case for retail display

The starting point

  • Part: tank liners for retail display
  • Existing route: a fibreglass lay-up
  • Annual volume: 600 pieces
  • Problems: high unit cost, long lead time, and variation between batches

What was wrong with the old route

The previous fibreglass lay-up needed several operations to reach finished shape, and every operation added both cost and a chance for variation. Weight was higher than it needed to be, and design changes meant new fixtures each time. For a programme of 600 pieces a year that is a poor fit.

What we built

ItemValue
Processthick gauge vacuum forming, 5-axis CNC trimming
Materialpolypropylene at 2 mm
Forming area usedup to 3,000 × 2,000 mm
Toolingaluminium production mould with a composite sample tool first
Finishtwo coat paint
Batch size75 pieces per release
First article5 weeks from drawing release
Documentationdimensional report, material certificate, first article inspection

tank liners formed from polypropylene

Process route

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  6. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

Results

  • removed two assembly operations
  • First article approved in 5 weeks
  • Tooling amortised inside the first production batch
  • Repeat releases match the approved sample: tooling and programmes are stored against the part number
  • 600 pieces shipped to date with no dimensional escapes

Lessons from this project

  • The 2 mm was set from the load case, which avoided over specifying the sheet and paying for weight that was not needed
  • Draft and radii were checked before the tool was cut, so the first sample released without hand work
  • The trim line was placed on a flat face, which kept the router inside ±0.2 mm
  • Tooling and programmes are stored against the part number, so repeat releases need no new proving run

What the client said

“The sample arrived on the date we were given and it fitted the assembly on the first try. The tank liners is lighter than the part it replaced and the finish holds up in the field. We now release the tank liners against stored tooling and the paperwork comes with the shipment.”

Frequently asked questions

Could the same route work on a different part?

If the part is a shell, cover, tray or enclosure between 1.5 mm and 12 mm thick, it is almost always worth quoting. Send the drawing and the answer comes back with a material and a tooling plan.

How is the tooling handled between orders?

Tooling, trim fixtures and programmes are kept against the part number for the life of the programme, so a repeat release needs no new proving run.

finished tank liners ready for shipment

Next step

Send the drawing or the existing tank liners with the annual quantity. The reply is a manufacturability review, a material recommendation and a quotation within 24 hours.

Need a part like this?

Send the 3D file or drawing with your quantity — manufacturability review and quotation within 24 hours.

Get a Quote

Leave a Message