5 mm food grade polypropylene component trays manufactured for beauty and spa equipment: food grade polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 10-15
Free QuoteThese food grade polypropylene component trays are thick gauge vacuum formed parts supplied to drawing for beauty and spa equipment. They are formed from food grade polypropylene sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | component trays |
| Typical application | beauty and spa equipment |
| Material | food grade polypropylene |
| Standard gauge | 5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | clear protective film, silk screened markings, powder coat finish |
| Minimum order | 25 pieces |
| Lead time to first article | 10–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Food grade polypropylene is used for trays, hoppers and liners that touch product, and it can be washed with caustic cleaners.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message