5 mm UV stabilised HDPE tank liners manufactured for elevator and escalator interiors: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 10-15 working
Free QuoteThese UV stabilised HDPE tank liners are thick gauge vacuum formed parts supplied to drawing for elevator and escalator interiors. They are formed from UV stabilised HDPE sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | tank liners |
| Typical application | elevator and escalator interiors |
| Material | UV stabilised HDPE |
| Standard gauge | 5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | as formed gloss, soft touch coating, two coat polyurethane paint |
| Minimum order | 100 pieces |
| Lead time to first article | 10–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.
Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Send the drawing or a photo of the current tank liners with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.