HIPS Display Shells Vacuum Formed in 2 mm for Atv And Utv

HIPS Display Shells Vacuum Formed in 2 mm for Atv And Utv

2 mm HIPS display shells manufactured for ATV and UTV: HIPS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 7-15 working days.

Free Quote

These HIPS display shells are thick gauge vacuum formed parts supplied to drawing for ATV and UTV. They are formed from HIPS sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

display shells

Product specification

ItemValue
Productdisplay shells
Typical applicationATV and UTV
MaterialHIPS
Standard gauge2 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssilk screened markings, soft touch coating, powder coat finish
Minimum order5 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HIPS keeps the weight down while stiffness is held through the formed shape
  • Silk screened markings finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • dash panels
  • cargo box liners
  • hoods
  • fenders
  • display shells used across general ATV and UTV builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming display shells from HIPS sheet

Material: HIPS

HIPS is the low cost route for indoor liners and disposable trays where impact strength is not critical.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • plan the trim line on a flat face so the router can hold tolerance
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • silk screened markings
  • soft touch coating
  • powder coat finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • material certificates with every batch
  • PPAP or ISIR on request
  • ISO 9001 quality system

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed display shells ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current display shells with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message