OEM Control Panels HIPS in 5 mm for Cleaning And Sanitation Equipment

OEM Control Panels HIPS in 5 mm for Cleaning And Sanitation Equipment

5 mm HIPS control panels manufactured for cleaning and sanitation equipment: HIPS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 working days.

Free Quote

These HIPS control panels are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from HIPS sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

control panels

Product specification

ItemValue
Productcontrol panels
Typical applicationcleaning and sanitation equipment
MaterialHIPS
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, pad printed logos, EMI shielding coating
Minimum order5 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HIPS keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • solution tank liners
  • machine covers
  • scrubber tanks
  • tool trays
  • control panels used across general cleaning and sanitation equipment builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming control panels from HIPS sheet

Material: HIPS

HIPS is the low cost route for indoor liners and disposable trays where impact strength is not critical.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • avoid sharp steps in the mould, which show as chill marks on the finished surface

Finishing and assembly options

  • clear protective film
  • pad printed logos
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • ISO 9001 quality system
  • PPAP or ISIR on request
  • material certificates with every batch

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed control panels ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current control panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message