6 mm HIPS ventilation shrouds manufactured for rail transit interiors: HIPS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 3-4 weeks.
Free QuoteThese HIPS ventilation shrouds are thick gauge vacuum formed parts supplied to drawing for rail transit interiors. They are formed from HIPS sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | ventilation shrouds |
| Typical application | rail transit interiors |
| Material | HIPS |
| Standard gauge | 6 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | mould texture, powder coat finish, two coat polyurethane paint |
| Minimum order | 10 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

HIPS is the low cost route for indoor liners and disposable trays where impact strength is not critical.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Send the drawing or a photo of the current ventilation shrouds with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.