5 mm UV stabilised HDPE Storage Bins Manufacturer for Water Treatment

5 mm UV stabilised HDPE Storage Bins Manufacturer for Water Treatment

5 mm UV stabilised HDPE storage bins manufactured for water treatment: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 2-3 weeks.

Free Quote

These UV stabilised HDPE storage bins are thick gauge vacuum formed parts supplied to drawing for water treatment. They are formed from UV stabilised HDPE sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

storage bins

Product specification

ItemValue
Productstorage bins
Typical applicationwater treatment
MaterialUV stabilised HDPE
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmould texture, as formed gloss, soft touch coating
Minimum order5 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Mould texture finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • control panel shells
  • channel covers
  • filter housings
  • dosing tank liners
  • storage bins used across general water treatment builds

How it is made

  1. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming storage bins from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • mould texture
  • as formed gloss
  • soft touch coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • material certificates with every batch
  • dimension reports with every release
  • UL94 V-0 grades available

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed storage bins ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current storage bins with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message