ABS/PMMA Door Panels Vacuum Formed in 5 mm for Water Treatment

ABS/PMMA Door Panels Vacuum Formed in 5 mm for Water Treatment

5 mm ABS/PMMA door panels manufactured for water treatment: ABS/PMMA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 10-15 working days.

Free Quote

These ABS/PMMA door panels are thick gauge vacuum formed parts supplied to drawing for water treatment. They are formed from ABS/PMMA sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

door panels

Product specification

ItemValue
Productdoor panels
Typical applicationwater treatment
MaterialABS/PMMA
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsEMI shielding coating, mould texture, silk screened markings
Minimum order50 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS/PMMA keeps the weight down while stiffness is held through the formed shape
  • Emi shielding coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • filter housings
  • channel covers
  • control panel shells
  • dosing tank liners
  • door panels used across general water treatment builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. The part cools on a jig so the shape is held while the material stabilises.

forming door panels from ABS/PMMA sheet

Material: ABS/PMMA

ABS/PMMA combines an ABS core with a hard acrylic cap, so the part has the toughness of ABS and the UV and scratch resistance of acrylic.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • EMI shielding coating
  • mould texture
  • silk screened markings
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • material certificates with every batch
  • RoHS compliant grades available
  • PPAP or ISIR on request

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed door panels ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current door panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message