These TPO centre consoles are thick gauge vacuum formed parts supplied to drawing for laboratory instruments. They are formed from TPO sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationlaboratory instruments
MaterialTPO
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssilk screened markings, soft touch coating, hot stamped accents
Minimum order50 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • TPO keeps the weight down while stiffness is held through the formed shape
  • Silk screened markings finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • instrument covers
  • fume hood liners
  • sample tray systems
  • analyser housings
  • centre consoles used across general laboratory instruments builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming centre consoles from TPO sheet

Material: TPO

TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • silk screened markings
  • soft touch coating
  • hot stamped accents
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • dimension reports with every release
  • ISO 9001 quality system
  • material certificates with every batch

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message