3 mm ABS/PC centre consoles manufactured for material handling: ABS/PC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 10-15 working days.

Free Quote

These ABS/PC centre consoles are thick gauge vacuum formed parts supplied to drawing for material handling. They are formed from ABS/PC sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationmaterial handling
MaterialABS/PC
Standard gauge3 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspad printed logos, silk screened markings, EMI shielding coating
Minimum order100 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS/PC keeps the weight down while stiffness is held through the formed shape
  • Pad printed logos finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • conveyor covers
  • picker truck panels
  • tote liners
  • pallet tops
  • centre consoles used across general material handling builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. The part cools on a jig so the shape is held while the material stabilises.

forming centre consoles from ABS/PC sheet

Material: ABS/PC

ABS/PC carries higher heat resistance than ABS alone, which matters for housings around motors, drives and power electronics.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • pad printed logos
  • silk screened markings
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • ISO 9001 quality system
  • PPAP or ISIR on request
  • dimension reports with every release

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message