Home / Product / Custom plastic manufacturing / Protective Guards 10 mm ABS Supplier for Battery Energy Storage Equipment /
10 mm ABS protective guards manufactured for battery energy storage: ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 2-3 weeks.
Free QuoteThese ABS protective guards are thick gauge vacuum formed parts supplied to drawing for battery energy storage. They are formed from ABS sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | protective guards |
| Typical application | battery energy storage |
| Material | ABS |
| Standard gauge | 10 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | UV stabilised as formed, two coat polyurethane paint, clear protective film |
| Minimum order | 50 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ABS is the default choice where the part needs stiffness, a paint finish and clean trimmed edges. It forms evenly, takes texture well and bonds with standard solvents.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message