HDPE Cable Covers Vacuum Formed in 10 mm for Material Handling

HDPE Cable Covers Vacuum Formed in 10 mm for Material Handling

10 mm HDPE cable covers manufactured for material handling: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 10-15 working days.

Free Quote

These HDPE cable covers are thick gauge vacuum formed parts supplied to drawing for material handling. They are formed from HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

cable covers

Product specification

ItemValue
Productcable covers
Typical applicationmaterial handling
MaterialHDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsas formed gloss, satin finish, powder coat finish
Minimum order25 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • As formed gloss finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • tote liners
  • picker truck panels
  • conveyor covers
  • pallet tops
  • cable covers used across general material handling builds

How it is made

  1. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming cable covers from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • as formed gloss
  • satin finish
  • powder coat finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • UL94 V-0 grades available
  • material certificates with every batch
  • PPAP or ISIR on request

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed cable covers ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current cable covers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message