Home / Product / Thermoforming process / OEM Machine Housings ESD safe ABS in 8 mm for Truck And Bus /
8 mm ESD safe ABS machine housings manufactured for truck and bus: ESD safe ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 7-15 working days.
Free QuoteThese ESD safe ABS machine housings are thick gauge vacuum formed parts supplied to drawing for truck and bus. They are formed from ESD safe ABS sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | machine housings |
| Typical application | truck and bus |
| Material | ESD safe ABS |
| Standard gauge | 8 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | soft touch coating, UV stabilised as formed, EMI shielding coating |
| Minimum order | 50 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ESD safe ABS keeps surface resistivity in the dissipative range, used for electronics carriers, tray systems and equipment covers in assembly areas.
Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current machine housings with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message