Centre Consoles 5 mm Kydex acrylic PVC Supplier for Dental Equipment Equipment

Centre Consoles 5 mm Kydex acrylic PVC Supplier for Dental Equipment Equipment

5 mm Kydex acrylic PVC centre consoles manufactured for dental equipment: Kydex acrylic PVC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 10-15 working days.

Free Quote

These Kydex acrylic PVC centre consoles are thick gauge vacuum formed parts supplied to drawing for dental equipment. They are formed from Kydex acrylic PVC sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationdental equipment
MaterialKydex acrylic PVC
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspowder coat finish, UV stabilised as formed, mould texture
Minimum order25 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • Kydex acrylic PVC keeps the weight down while stiffness is held through the formed shape
  • Powder coat finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • instrument tray covers
  • cabinet panels
  • suction unit housings
  • chair shrouds
  • centre consoles used across general dental equipment builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming centre consoles from Kydex acrylic PVC sheet

Material: Kydex acrylic PVC

Kydex acrylic PVC sheet is specified for interior trim that must resist scuffing and meet fire, smoke and toxicity rules.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • powder coat finish
  • UV stabilised as formed
  • mould texture
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • material certificates with every batch
  • dimension reports with every release
  • PPAP or ISIR on request

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message