HDPE Battery Boxes Vacuum Formed in 10 mm for Motorcycle And Scooter

HDPE Battery Boxes Vacuum Formed in 10 mm for Motorcycle And Scooter

10 mm HDPE battery boxes manufactured for motorcycle and scooter: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 10-15 working days.

Free Quote

These HDPE battery boxes are thick gauge vacuum formed parts supplied to drawing for motorcycle and scooter. They are formed from HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

battery boxes

Product specification

ItemValue
Productbattery boxes
Typical applicationmotorcycle and scooter
MaterialHDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti graffiti coating, silk screened markings, two coat polyurethane paint
Minimum order1 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Anti graffiti coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • side covers
  • top box shells
  • windscreen mounts
  • fairing panels
  • battery boxes used across general motorcycle and scooter builds

How it is made

  1. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming battery boxes from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • anti graffiti coating
  • silk screened markings
  • two coat polyurethane paint
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • food contact declarations available
  • UL94 V-0 grades available
  • material certificates with every batch

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed battery boxes ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current battery boxes with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message