These PC/ASA component trays are thick gauge vacuum formed parts supplied to drawing for HVAC equipment. They are formed from PC/ASA sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

component trays

Product specification

ItemValue
Productcomponent trays
Typical applicationHVAC equipment
MaterialPC/ASA
Standard gauge8 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspad printed logos, powder coat finish, UV stabilised as formed
Minimum order1 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PC/ASA keeps the weight down while stiffness is held through the formed shape
  • Pad printed logos finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • condensate trays
  • unit covers
  • duct end caps
  • fan shrouds
  • component trays used across general HVAC equipment builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming component trays from PC/ASA sheet

Material: PC/ASA

PC/ASA blends impact strength with weatherability, used for outdoor equipment covers that also need to survive knocks.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • plan the trim line on a flat face so the router can hold tolerance
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • pad printed logos
  • powder coat finish
  • UV stabilised as formed
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • UL94 V-0 grades available
  • material certificates with every batch
  • food contact declarations available

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed component trays ready for shipment

Frequently asked questions

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message