10 mm Kydex acrylic PVC machine housings manufactured for playground equipment: Kydex acrylic PVC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 working days.

Free Quote

These Kydex acrylic PVC machine housings are thick gauge vacuum formed parts supplied to drawing for playground equipment. They are formed from Kydex acrylic PVC sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

machine housings

Product specification

ItemValue
Productmachine housings
Typical applicationplayground equipment
MaterialKydex acrylic PVC
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspowder coat finish, UV stabilised as formed, clear protective film
Minimum order5 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • Kydex acrylic PVC keeps the weight down while stiffness is held through the formed shape
  • Powder coat finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • panel covers
  • climbing tower caps
  • seat buckets
  • slide shells
  • machine housings used across general playground equipment builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. The part cools on a jig so the shape is held while the material stabilises.

forming machine housings from Kydex acrylic PVC sheet

Material: Kydex acrylic PVC

Kydex acrylic PVC sheet is specified for interior trim that must resist scuffing and meet fire, smoke and toxicity rules.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • powder coat finish
  • UV stabilised as formed
  • clear protective film
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • REACH compliant sheet available
  • food contact declarations available
  • dimension reports with every release

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed machine housings ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current machine housings with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message