12 mm ASA hoppers manufactured for water treatment: ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 10-15 working days.

Free Quote

These ASA hoppers are thick gauge vacuum formed parts supplied to drawing for water treatment. They are formed from ASA sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoppers

Product specification

ItemValue
Producthoppers
Typical applicationwater treatment
MaterialASA
Standard gauge12 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssilk screened markings, matte finish, satin finish
Minimum order100 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ASA keeps the weight down while stiffness is held through the formed shape
  • Silk screened markings finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • food contact declarations available

Typical applications

  • dosing tank liners
  • filter housings
  • control panel shells
  • channel covers
  • hoppers used across general water treatment builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming hoppers from ASA sheet

Material: ASA

ASA keeps its colour and surface under UV better than ABS, which suits outdoor covers that are not painted.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • silk screened markings
  • matte finish
  • satin finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • food contact declarations available
  • PPAP or ISIR on request
  • ISO 9001 quality system

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed hoppers ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current hoppers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message