Home / Product / Custom plastic manufacturing / Centre Consoles PMMA acrylic in 1.5 mm for Pool And Spa – Formed to Drawing /
1.5 mm PMMA acrylic centre consoles manufactured for pool and spa: PMMA acrylic sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 7-15 working days.
Free QuoteThese PMMA acrylic centre consoles are thick gauge vacuum formed parts supplied to drawing for pool and spa. They are formed from PMMA acrylic sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | centre consoles |
| Typical application | pool and spa |
| Material | PMMA acrylic |
| Standard gauge | 1.5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | anti graffiti coating, satin finish, powder coat finish |
| Minimum order | 5 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

PMMA gives the glossiest surface and the best UV stability, which is why it is used for light housings and outdoor sign faces.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message