HDPE Cart Panels Vacuum Formed in 1.5 mm for Medical Equipment

HDPE Cart Panels Vacuum Formed in 1.5 mm for Medical Equipment

1.5 mm HDPE cart panels manufactured for medical equipment: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 3-4 weeks.

Free Quote

These HDPE cart panels are thick gauge vacuum formed parts supplied to drawing for medical equipment. They are formed from HDPE sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

cart panels

Product specification

ItemValue
Productcart panels
Typical applicationmedical equipment
MaterialHDPE
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssatin finish, EMI shielding coating, anti graffiti coating
Minimum order1 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Satin finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • device trolleys
  • imaging equipment panels
  • monitor shrouds
  • dialysis machine covers
  • cart panels used across general medical equipment builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming cart panels from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • plan the trim line on a flat face so the router can hold tolerance
  • avoid sharp steps in the mould, which show as chill marks on the finished surface

Finishing and assembly options

  • satin finish
  • EMI shielding coating
  • anti graffiti coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • material certificates with every batch
  • RoHS compliant grades available
  • PPAP or ISIR on request

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed cart panels ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current cart panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message