Thick Gauge Kydex acrylic PVC Centre Consoles in 3 mm – Elevator And Escalator Interiors Range

Thick Gauge Kydex acrylic PVC Centre Consoles in 3 mm – Elevator And Escalator Interiors Range

3 mm Kydex acrylic PVC centre consoles manufactured for elevator and escalator interiors: Kydex acrylic PVC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 10-15 workin

Free Quote

These Kydex acrylic PVC centre consoles are thick gauge vacuum formed parts supplied to drawing for elevator and escalator interiors. They are formed from Kydex acrylic PVC sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationelevator and escalator interiors
MaterialKydex acrylic PVC
Standard gauge3 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssatin finish, powder coat finish, hot stamped accents
Minimum order10 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • Kydex acrylic PVC keeps the weight down while stiffness is held through the formed shape
  • Satin finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • car linings
  • handrail deck covers
  • ceiling panels
  • landing sill covers
  • centre consoles used across general elevator and escalator interiors builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming centre consoles from Kydex acrylic PVC sheet

Material: Kydex acrylic PVC

Kydex acrylic PVC sheet is specified for interior trim that must resist scuffing and meet fire, smoke and toxicity rules.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • satin finish
  • powder coat finish
  • hot stamped accents
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • dimension reports with every release
  • PPAP or ISIR on request
  • food contact declarations available

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message