OEM Display Shells UV stabilised HDPE in 6 mm for Aerospace Interiors

OEM Display Shells UV stabilised HDPE in 6 mm for Aerospace Interiors

6 mm UV stabilised HDPE display shells manufactured for aerospace interiors: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 10-15 working days.

Free Quote

These UV stabilised HDPE display shells are thick gauge vacuum formed parts supplied to drawing for aerospace interiors. They are formed from UV stabilised HDPE sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

display shells

Product specification

ItemValue
Productdisplay shells
Typical applicationaerospace interiors
MaterialUV stabilised HDPE
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssoft touch coating, matte finish, mould texture
Minimum order1 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Soft touch coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • galley liners
  • stowage bin trays
  • seat back shells
  • lavatory panels
  • display shells used across general aerospace interiors builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming display shells from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • soft touch coating
  • matte finish
  • mould texture
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • RoHS compliant grades available
  • dimension reports with every release
  • ISO 9001 quality system

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed display shells ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Request a quotation

Send the drawing or a photo of the current display shells with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message