PETG Machine Housings Vacuum Formed in 4 mm for Ev Charging

PETG Machine Housings Vacuum Formed in 4 mm for Ev Charging

4 mm PETG machine housings manufactured for EV charging: PETG sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 7-15 working days.

Free Quote

These PETG machine housings are thick gauge vacuum formed parts supplied to drawing for EV charging. They are formed from PETG sheet at 4 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

machine housings

Product specification

ItemValue
Productmachine housings
Typical applicationEV charging
MaterialPETG
Standard gauge4 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti graffiti coating, satin finish, as formed gloss
Minimum order25 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PETG keeps the weight down while stiffness is held through the formed shape
  • Anti graffiti coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • cable management panels
  • wallbox covers
  • payment terminal bezels
  • charger housings
  • machine housings used across general EV charging builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming machine housings from PETG sheet

Material: PETG

PETG forms at a low temperature, holds detail well and is accepted for food contact, which suits trays, guards and machine covers in food plants.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • anti graffiti coating
  • satin finish
  • as formed gloss
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • dimension reports with every release
  • food contact declarations available
  • ISO 9001 quality system

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed machine housings ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current machine housings with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message