8 mm ESD safe ABS equipment covers manufactured for marine and boat building: ESD safe ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 7-15 working days.
Free QuoteThese ESD safe ABS equipment covers are thick gauge vacuum formed parts supplied to drawing for marine and boat building. They are formed from ESD safe ABS sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | equipment covers |
| Typical application | marine and boat building |
| Material | ESD safe ABS |
| Standard gauge | 8 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | satin finish, anti graffiti coating, powder coat finish |
| Minimum order | 100 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ESD safe ABS keeps surface resistivity in the dissipative range, used for electronics carriers, tray systems and equipment covers in assembly areas.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current equipment covers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message