Splash Guards 10 mm UV stabilised HDPE Supplier for Water Treatment Equipment

Splash Guards 10 mm UV stabilised HDPE Supplier for Water Treatment Equipment

10 mm UV stabilised HDPE splash guards manufactured for water treatment: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 7-15 working days.

Free Quote

These UV stabilised HDPE splash guards are thick gauge vacuum formed parts supplied to drawing for water treatment. They are formed from UV stabilised HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

splash guards

Product specification

ItemValue
Productsplash guards
Typical applicationwater treatment
MaterialUV stabilised HDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti static coating, silk screened markings, matte finish
Minimum order50 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Anti static coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • food contact declarations available

Typical applications

  • filter housings
  • channel covers
  • control panel shells
  • dosing tank liners
  • splash guards used across general water treatment builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming splash guards from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • anti static coating
  • silk screened markings
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • PPAP or ISIR on request
  • UL94 V-0 grades available
  • ISO 9001 quality system

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed splash guards ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current splash guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message