OEM Light Housings UV stabilised HDPE in 6 mm for Material Handling

OEM Light Housings UV stabilised HDPE in 6 mm for Material Handling

6 mm UV stabilised HDPE light housings manufactured for material handling: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 2-3 weeks.

Free Quote

These UV stabilised HDPE light housings are thick gauge vacuum formed parts supplied to drawing for material handling. They are formed from UV stabilised HDPE sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

light housings

Product specification

ItemValue
Productlight housings
Typical applicationmaterial handling
MaterialUV stabilised HDPE
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssatin finish, clear protective film, two coat polyurethane paint
Minimum order25 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Satin finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • picker truck panels
  • conveyor covers
  • pallet tops
  • tote liners
  • light housings used across general material handling builds

How it is made

  1. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming light housings from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • satin finish
  • clear protective film
  • two coat polyurethane paint
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • ISO 9001 quality system
  • food contact declarations available
  • UL94 V-0 grades available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed light housings ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current light housings with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message