10 mm recycled HDPE ventilation shrouds manufactured for commercial laundry: recycled HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 2-3 weeks.
Free QuoteThese recycled HDPE ventilation shrouds are thick gauge vacuum formed parts supplied to drawing for commercial laundry. They are formed from recycled HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | ventilation shrouds |
| Typical application | commercial laundry |
| Material | recycled HDPE |
| Standard gauge | 10 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | mould texture, pad printed logos, soft touch coating |
| Minimum order | 1 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Recycled HDPE sheet lowers material cost and supports sustainability targets, with mechanical properties close to virgin sheet for non critical parts.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current ventilation shrouds with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message