2 mm ABS/PMMA control panels manufactured for signage and wayfinding: ABS/PMMA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 2-3 weeks.
Free QuoteThese ABS/PMMA control panels are thick gauge vacuum formed parts supplied to drawing for signage and wayfinding. They are formed from ABS/PMMA sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | control panels |
| Typical application | signage and wayfinding |
| Material | ABS/PMMA |
| Standard gauge | 2 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | hot stamped accents, powder coat finish, EMI shielding coating |
| Minimum order | 10 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ABS/PMMA combines an ABS core with a hard acrylic cap, so the part has the toughness of ABS and the UV and scratch resistance of acrylic.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current control panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.