Tank Liners 3 mm polypropylene Supplier for Hvac Equipment Equipment

Tank Liners 3 mm polypropylene Supplier for Hvac Equipment Equipment

3 mm polypropylene tank liners manufactured for HVAC equipment: polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 7-15 working days.

Free Quote

These polypropylene tank liners are thick gauge vacuum formed parts supplied to drawing for HVAC equipment. They are formed from polypropylene sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

tank liners

Product specification

ItemValue
Producttank liners
Typical applicationHVAC equipment
Materialpolypropylene
Standard gauge3 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsas formed gloss, clear protective film, matte finish
Minimum order1 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • polypropylene keeps the weight down while stiffness is held through the formed shape
  • As formed gloss finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • unit covers
  • condensate trays
  • fan shrouds
  • duct end caps
  • tank liners used across general HVAC equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming tank liners from polypropylene sheet

Material: polypropylene

Polypropylene survives repeated impact and most cleaning chemicals. Its low forming temperature keeps cycles short, but it shrinks more, so the mould is cut with the shrink factor built in.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • plan the trim line on a flat face so the router can hold tolerance
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • as formed gloss
  • clear protective film
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • PPAP or ISIR on request
  • RoHS compliant grades available
  • dimension reports with every release

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed tank liners ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current tank liners with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message