3 mm PC/ASA dashboards manufactured for marine and boat building: PC/ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.
Free QuoteThese PC/ASA dashboards are thick gauge vacuum formed parts supplied to drawing for marine and boat building. They are formed from PC/ASA sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | dashboards |
| Typical application | marine and boat building |
| Material | PC/ASA |
| Standard gauge | 3 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | satin finish, anti graffiti coating, two coat polyurethane paint |
| Minimum order | 100 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

PC/ASA blends impact strength with weatherability, used for outdoor equipment covers that also need to survive knocks.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current dashboards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message