6 mm recycled HDPE plastic enclosures manufactured for elevator and escalator interiors: recycled HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 10-15 working da
Free QuoteThese recycled HDPE plastic enclosures are thick gauge vacuum formed parts supplied to drawing for elevator and escalator interiors. They are formed from recycled HDPE sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | plastic enclosures |
| Typical application | elevator and escalator interiors |
| Material | recycled HDPE |
| Standard gauge | 6 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | EMI shielding coating, two coat polyurethane paint, powder coat finish |
| Minimum order | 100 pieces |
| Lead time to first article | 10–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Recycled HDPE sheet lowers material cost and supports sustainability targets, with mechanical properties close to virgin sheet for non critical parts.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.
Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current plastic enclosures with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message