Skid Plates ABS in 8 mm for Defence And Security Equipment – Formed to Drawing

Skid Plates ABS in 8 mm for Defence And Security Equipment – Formed to Drawing

8 mm ABS skid plates manufactured for defence and security equipment: ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.

Free Quote

These ABS skid plates are thick gauge vacuum formed parts supplied to drawing for defence and security equipment. They are formed from ABS sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

skid plates

Product specification

ItemValue
Productskid plates
Typical applicationdefence and security equipment
MaterialABS
Standard gauge8 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti graffiti coating, pad printed logos, EMI shielding coating
Minimum order100 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS keeps the weight down while stiffness is held through the formed shape
  • Anti graffiti coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • case shells
  • console covers
  • antenna covers
  • transport trays
  • skid plates used across general defence and security equipment builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming skid plates from ABS sheet

Material: ABS

ABS is the default choice where the part needs stiffness, a paint finish and clean trimmed edges. It forms evenly, takes texture well and bonds with standard solvents.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • plan the trim line on a flat face so the router can hold tolerance
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • anti graffiti coating
  • pad printed logos
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • ISO 9001 quality system
  • REACH compliant sheet available
  • dimension reports with every release

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed skid plates ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current skid plates with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message