Thick Gauge flame retardant ABS Dashboards in 10 mm – Catering And Kitchen Equipment Range

Thick Gauge flame retardant ABS Dashboards in 10 mm – Catering And Kitchen Equipment Range

10 mm flame retardant ABS dashboards manufactured for catering and kitchen equipment: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 7-15 working da

Free Quote

These flame retardant ABS dashboards are thick gauge vacuum formed parts supplied to drawing for catering and kitchen equipment. They are formed from flame retardant ABS sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

dashboards

Product specification

ItemValue
Productdashboards
Typical applicationcatering and kitchen equipment
Materialflame retardant ABS
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti static coating, pad printed logos, as formed gloss
Minimum order1 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • flame retardant ABS keeps the weight down while stiffness is held through the formed shape
  • Anti static coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • hood panels
  • service trolley trays
  • bain marie liners
  • refrigerated well covers
  • dashboards used across general catering and kitchen equipment builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming dashboards from flame retardant ABS sheet

Material: flame retardant ABS

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • anti static coating
  • pad printed logos
  • as formed gloss
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • PPAP or ISIR on request
  • REACH compliant sheet available
  • food contact declarations available

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed dashboards ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current dashboards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message